Documents library.
English catalogue of draft types. Romanian sites use the Site documentation catalogue.
Project Intake
What must exist before drafting starts.
- Project charterName, type, jurisdiction, language.
- Stakeholder registerRoles TBC until the list is issued.
- Site information requestSurvey, GI, bathymetry needed.
- Kick-off agendaDocument-control points only.
- Document control procedureRevisions, transmittal, draft status.
- Required deliverables listAgreed at project start.
Tender
Heading-level. Prices and quantities stay TBC.
- Tender coverPackage identification.
- Tender Method Statement outlineSequence as headings.
- Programme narrativeNo invented days.
- Tender risk registerRisks as questions.
- Clarification / tender RFI logGaps linked to questions.
- BOQ coverQuantities TBC until take-off.
Method & HSE
Drafts. They do not authorise work.
- Method StatementSequence, plant, crew: TBC until sourced.
- RAMS / HIRANo copied residual scores.
- Permit to Work (form)Blank until site procedure exists.
- Lifting planRadii, SWL, weights TBC.
- Diving plan (marine)Depths, gas, chamber TBC.
- Emergency plan / ERPContacts stay TBC.
- Toolbox talkTopic and attendance blank.
QA/QC
Acceptance criteria stay TBC without a spec.
- Inspection and Test Plan (ITP)Hold points TBC until QC procedure.
- Material Inspection Request (MIR)Grade TBC without certificate.
- Nonconformance Report (NCR)Blank form. Decret does not inspect.
- Material submittalOnly the data sheet in hand.
- Inspection requestNo invented survey results.
- Hold-point scheduleFrom the ITP. Notice TBC.
Daily
Weather, tide, output: TBC without a diary.
- Daily Progress ReportQuantities TBC.
- Site diaryBlank until completed on site.
- Weather / tide logNo invented tide tables.
- Labour / plant returnNames and hours TBC.
- Photo logPoints to your uploads.
Suppliers
Register structure. No invented companies.
- Supplier registerRows TBC.
- Material submittal trackerStatus: draft / needs input.
- Delivery inspectionQuantity from the delivery note.
- Certificate of conformity checklistBlank until the PDF is in hand.
Handover
As-builts and close-out. Source required.
- As-built registerRevisions TBC until transmittal.
- O&M manual coverContent TBC without equipment data.
- Punch list / snaggingBlank form.
- Draft taking-over certificateDraft status. Not issued.
- Spare parts listTBC until manufacturer list.